Shenzhen/Guangxi/Changsha

Essential skills that PCB engineers must master: key signal routing

In the PCB routing rules, there is a principle of “key signal lines first”, that is, key signals such as power, analog signals, high-speed signals, clock signals, differential signals and synchronization signals are routed first. Next, let’s take a closer look at the routing requirements of these key signals. Analog

Read More »

What checks need to be done after PCB layout and routing?

Layout and routing are the two most important links in PCB design. After engineers complete the layout and routing of PCB in accordance with the requirements of signal quality, DFM, EMC and other rules, they also need to check the relevant content. Layout check In PCB design, reasonable layout is

Read More »

PCB industry terms and definitions – Power Integrity (PI)

Power integrity, referred to as PI, is to confirm whether the voltage and current of the power source and destination meet the requirements. At present, power integrity is still one of the biggest challenges in high-speed PCB design. Power integrity involves the chip level, chip package level, circuit board level

Read More »

Basic knowledge of PCB design: Requirements for component silk screen design

In PCB silk screen design, it mainly includes: component silk screen, board name, version number, barcode silk screen, mounting hole positioning hole silk screen, board direction mark, anti-static mark, positioning identification point, etc. Today, we mainly learn about the requirements for component silk screen design. General requirements for silk screen

Read More »

WE'RE HERE TO HELP

 From engineering advice to selecting the right manufacturing partner for
you – our experience and expertise gives you the right solution. 

Get in touch and let’s start working together.

Smarter PCB Solutions for Your Business: Economical, Innovative, and Efficient

Office Address

Shenzhen

Guangxi

Changsha

Factory Address

Shenzhen:
F/1-3, Bldg 3, Liansheng Industiral Park, Shangxing, Shajing Town, Baoan District, Shenzhen Guangdong

Guangxi:
Building 19, Jinjiping Industrial Park, Xinping Town,
Lipu City,Guangxi

© 2024 All Rights Reserved.

Scroll to Top
Days
Hours
Minutes
Seconds

Get Free Samples Now

You can get the quota for free samples of 2 layer and 4 layer from our sales.
Upload Gerber Files– EQ(1-2 hours)–Production(3-4 days)–ship(5-7days) .
Then,free samples will in your hand.
After sending the file, please pay attention to the email from our sales in 1-2 hours.